最高学历:
工作年限:
获取测评结果
Which of the following best describes the main constraints of the project?
下面哪项最好的描述了项目的主要制约因素?
A. Scope of work, number of resources, cost
A.工作范围,资源数量,成本
B. Scope of work, cost, time
B.工作范围,成本,时间
C. Resources, quality, budget, scope, risk and schedule
C.资源,质量,预算、范围、风险和进度
D. Time, cost, and quantity of changes
D.时间,成本,和变更数量